Airport works description:
-
Received Technical information included Building services dwgs from Airport Authority.
-
Issued Initial MVAC Design Drawings c/w Loading calculations for AA Approval.
-
Submitted Material for approval
-
Ordered and delivered material to site once got the work permit from AA.
-
PICV ( Pressure independent control valve ) is a must equipment to all sites and the model and controlled chiller water Flow are subject to AA approval before ordered and delivered
-
Perform T&C after MVAC work completed and submitted the final report to AA for Record and final approval.